08-22 新西敏 · 本地要闻

今天的合成稿有数字或结论对不上素材,为稳妥起见这一期出素材版:下面是各官方源原文链接。

:houses: 本地(10 条)

:warning: 出行与天气警报(7 条)

  • [天气预报]2026-08-22 | 来源:ECCC 天气预报·新西敏 | Current Conditions: Mainly Clear, 16.9°C
    URL: New Westminster, BC - 7 Day Forecast - Environment Canada
    摘要:Observed at: Vancouver Int’l Airport 5:00 AM PDT Saturday 22 August 2026 Condition: Mainly Clear Temperature: 16.9°C Pressure / Tendency: 101.4 kPa rising Visibility: 32 km Humidity: 89 % Dewpoint: 15.1°C Wind: ESE 13 km
  • [天气预报]2026-08-22 | 来源:ECCC 天气预报·新西敏 | Saturday: Chance of showers. High 21. POP 60%
    URL: New Westminster, BC - 7 Day Forecast - Environment Canada
    摘要:Becoming cloudy this morning with 60 percent chance of showers. Risk of a thunderstorm this afternoon. High 21. Humidex 25. UV index 5 or moderate. Forecast issued 5:00 AM PDT Saturday 22 August 2026
  • [天气预报]2026-08-22 | 来源:ECCC 天气预报·新西敏 | Saturday night: A few showers. Low 15.
    URL: New Westminster, BC - 7 Day Forecast - Environment Canada
    摘要:Showers with risk of a thunderstorm. Low 15. Forecast issued 5:00 AM PDT Saturday 22 August 2026
  • [天气预报]2026-08-22 | 来源:ECCC 天气预报·新西敏 | Sunday: Showers. High 21.
    URL: New Westminster, BC - 7 Day Forecast - Environment Canada
    摘要:Showers ending late in the morning then clearing. Risk of a thunderstorm in the morning. High 21. Humidex 25. UV index 5 or moderate. Forecast issued 5:00 AM PDT Saturday 22 August 2026
  • [MAJOR]2026-08-13 | 来源:DriveBC 路况事件 | [Other Roads] Paving operations from Tannery Road Offramp, In Surrey and At Highway 17 Westbound to In Surrey and At Tannery Rd.
    URL: https://www.drivebc.ca/
    摘要:Paving operations from Tannery Road Offramp, In Surrey and At Highway 17 Westbound to In Surrey and At Tannery Rd. Starting Fri Aug 21 until Mon Aug 24. Closed. Detour in effect. Last update: August 13th, 2026 at 3:42pm
  • [MAJOR]2026-07-16 | 来源:DriveBC 路况事件 | [Highway 91A] Bridge maintenance.
    URL: https://www.drivebc.ca/
    摘要:Bridge maintenance. Starting Thu Mar 26 until Sun Nov 15. From 9:30 PM to 9:00 AM PST on Saturday and Sunday. From 9:30 PM to 5:00 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Reduced to one lane each dire
  • [MAJOR]2026-06-27 | 来源:DriveBC 路况事件 | [Highway 7B] Bridge construction.
    URL: https://www.drivebc.ca/
    摘要:Bridge construction. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Be advised: There are two lanes in eac
    本帖为当日快讯,时效以文内官方链接为准。